Protect
Secure openings, utilities and active loss.
A private recovery workspace for owners of partially renovated homes—rebuilding the permit and inspection file, pricing what remains and testing whether completion still earns the risk.
This organizer does not inspect work, issue a permit, interpret plans, approve concealment, estimate market value or establish contractor, lien or legal rights.
Open the recovery fileSecure openings, utilities and active loss.
Collect plans, permits, inspections and contracts.
Decide what may stay, change or be opened.
Sequence remaining work, risk and carrying time.
Compare finish, pause and as-is outcomes.
Mark each layer unknown, blocked or verified. “Installed” is not the same as approved, warrantable, code-compliant or reusable.
Security, temporary protection, roof/openings, drainage, utilities and active-loss control
Current drawings, revisions, engineering, selections and written remaining scope
Foundation, framing, sheathing, roofing, windows, exterior and required inspections
Electrical, plumbing, HVAC, gas and fire-system rough work with trade responsibility
Required rough, framing, insulation and other approvals before assemblies are concealed
Drywall, waterproofing, cabinets, trim, flooring, fixtures, appliances and finishes
Trade finals, building final, corrections, certificates and complete closeout file
A new contractor should not inherit undocumented assumptions. Collect records from the authority and source—not screenshots alone.
Enter current remaining estimates, money already contractually committed and scope confidence. Verify contracts before treating a deposit as transferable or recoverable.
$26,500 is marked committed inside the direct estimate. Do not add it twice.
Do not compare gross finished value to cash today. Include remaining capital, time, risk, debt and transaction assumptions in both paths.
City limits, extraterritorial jurisdiction, property facts and work scope determine which authority and rules apply.
Official building, remodel, repair, homeowner and contractor permit starting points.
Official instructions for searching an address, licensed professional, contact or record.
Official registered-contractor search plus category, complaint and sanction context.
Current Development Services inspection scheduling, status and contact routes.
Official zoning, overlays, verification and property research starting points.
Official Texas lookup for regulated occupations and trade credentials.
Official Texas State Board of Plumbing Examiners public license search.
Current consumer guidance for lead-safe renovation, repair and painting in pre-1978 housing.
Possibly, but do not assume it. Permit holder, contractor registration, trade permits, ownership, expired or inactive records, plan revisions and local procedures can change the route. Ask the issuing authority using the exact permit record.
Not until the required inspections and documentation are confirmed. Concealing unapproved work may require destructive opening and can erase evidence needed to diagnose or price corrections.
Use permit and inspection history plus evaluation by the relevant qualified professional or trade. Appearance, payment, a contractor statement or a passed inspection in another workstream may not establish reuse.
Include investigation, protection, correction, design/engineering, permits, labor, material, equipment, taxes, disposal, utilities, insurance, financing, carry, contingency, inspections, punch and closeout.
Historic spend matters for accounting, claims, liens and tax records, but it is generally sunk for the decision. Compare new money and new risk required from today against current alternatives.
Give bidders the same plan set, inspection record and remaining scope. Require exclusions, allowances, schedule, responsible trades, permits, inspection sequence, payment milestones, change orders, cleanup and closeout.
It depends on scope, observed conditions, approved plans and authority requirements. Structural changes, movement, removed members, foundations and undocumented alterations are common reasons to ask the authority or a qualified engineer before construction.
Preserve contracts, notices, payments, invoices, delivery records and communications. Before paying replacements or disposing of material, get qualified legal/title guidance on lien, ownership, termination and claim issues.
Paint-disturbing work in most pre-1978 housing can implicate federal RRP rules, especially paid work, rentals and renovation-for-sale activity. Verify current coverage and certified-firm requirements before disturbance.
Compare supported net outcomes on the same date: current as-is value, debt, remaining scope, corrections, carry, time, contingency, transaction costs and supported finished value. Stress-test cost and schedule overruns.
A current as-is option creates a comparable decision baseline. It does not prove selling is best, excuse unsafe conditions or resolve permits, title, liens or contracts.